In the standard system, the production order type is determined either by an assignment to a plant (production control profile) or by the MRP group. With our flexible logic, you can determine the production order type according to complex criteria. For example, the production order type could be different for a new product and for a repair. This means that different BOMs, routings, and other master data can be determined differently.

XPP002 – Production order type determination
Mehr Produkte:
-

XSD013 – Storage location determination – Sales
If you are not satisfied with the fields available in the standard system for storage location determination…
